Field notes
Notes from the factory floor.
What we learn walking floors, tracing information flow, and connecting the systems manufacturers already own.
- Operations
The four-day-old number
If leadership sees production status on Thursday for work that happened Monday, the problem is not the report. It is that the report exists at all.
- Systems Integration
Your ERP is not the problem
Every shop we walk into blames the ERP. Almost none of them have an ERP problem — they have a handoff problem, and replacing the software would leave it exactly where it is.